If you are adding a miscellaneous event, then select "Not Specified". This specifies how many times the talk has been heard in your congregation. Some public talk outlines have official images or videos to be used. Press on the arrow to choose a date for when the talk was last heard. You can also click on the separate parts of the date in the edit box and use the arrow keys to adjust the date. If checked, the date entry gets disabled and assigned the date of 26th July, 1931 (this was the date when we took on the name Jehovah's Witnesses). Uncheck this option and the date field will get enabled again and set to today's date. When checked, it means that you have never heard this talk before in your congregation. By assigning it such an old date, it means it will be correctly placed in any reports that you generate in date order.Įach paper outline has an issue date in the lower left corner (e.g.: 04/18 for April 2018 ). The database is provided with an initial set of issue dates. These are accurate to the best of my ability however it is your responsibility to ensure these dates are maintained. Set the option No outline date for any custom entry in the database (for example: Circuit Overseer outline). Some times you might be instructed to take a talk outline out of circulation for a while.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |